Fire & Life Safety

  • Fire Hazard Identification
  • Review of current fire and life safety infrastructure of the property as per drawing
  • Review of Onsite Emergency Plant (OSEP)
  • Checking the fire damper for its working condition
  • Checking of all access doors for integration with fire alarm
  • Checking of water pressure at the terrace of fire hydrant line
  • Checking the working of exhaust and integration with fire alarm
  • Checking of staircase for its pressurization, if done
  • Checking of fire man switch in the lift
  • Checking of fire extinguisher for its refilling and servicing status
  • Review the functional testing of fire and life safety system
  • Onsite installation review of protection system in the peripheral areas
  • Examine the availability of suitable emergency plan
  • Review of gaseous suppression system
  • Physical verification of fire pump rooms
  • Physical verification of all pumps with working status and parameters
  • Ascertaining the calibration and functional level of all pressure gauges
  • Review of inspection, testing and maintenance programs
  • Physical verification of pumps and panels related to fire safety and energy on test response and output
  • Physical verification of sprinkler system and working condition
  • Review of passive fire protection system
  • Review of PPE issuance record
  • Core compliance review of NBC 2016
  • Review of electrical maintenance activities
  • Review of all electrical testing reports for transformers, cables, protective devices, earth pits, power quality
  • Checking for earthing system
  • Check for lighting and power circuits Checking the condition of lightning arrestor
  • Power distribution network: unsafe condition and physical observation
  • Preparedness for emergency
  • System checking: available Drawing / SOP / OCP / Training
  • Review of documents related to Evacuation Drill
  • Complete physical check and review of BMS system and adherence\
  • Physical verification of diesel yard storage system and its working status
  • Physical verification of CV TV working condition and maintaining status of proceeding footages

Fire Load Calculation

  • Identification of building occupancy type
  • Assessment of building layout and usage
  • Survey of materials and contents
  • Estimation of fire load density
  • Collection of material calorific values
  • Zoning the premises
  • Assessment of storage practices
  • Consideration of fire protection measures
  • Compliance with relevant codes and standards
  • Identification of fire hazardous areas
  • Documentation and record keeping
  • Incorporation of future modifications
  • Evaluation of occupant load and movement
  • Coordination with stakeholders
  • Preparation of fire load report

Study on Chemical Compatibility

  • Identification of all chemicals used, stored, or handled
  • Classification of chemicals by hazard class (flammable, oxidizer, corrosive, etc.)
  • Review of Safety Data Sheets (SDS) for all chemicals
  • Assessment of chemical storage conditions and containers
  • Evaluation of existing segregation practices
  • Analysis of potential chemical interactions or reactions
  • Verification of labeling and signage for hazardous materials
  • Inspection of storage facilities for containment and ventilation
  • Mapping of chemical storage locations and proximity
  • Compliance check with relevant regulatory standards (e.g., OSHA, NFPA, GHS)
  • Review of spill control and emergency response procedures
  • Assessment of material handling practices and equipment
  • Coordination with safety, operations, and environmental teams
  • Documentation of compatibility groupings and incompatibilities
  • Preparation of a chemical compatibility matrix and summary report

Hazard Identification & Risk Assessment – HIRA

  • Opening meeting with each domain heads
  • Walk through across the plant / office
  • Availability of documented HIRA procedure
  • Involvement of competent personnel in HIRA
  • Identification of all routine and non-routine tasks
  • Use of standardized risk assessment methodology
  • Consideration of physical, chemical, biological, ergonomic, and psychosocial hazards
  • Evaluation of existing control measures
  • Assessment of likelihood and severity of risks
  • Documentation and approval of risk assessments
  • Communication of HIRA findings to all relevant employees
  • Review and update of HIRA after changes in process/equipment
  • Inclusion of emergency situations in risk assessment
  • Hierarchy of controls applied effectively
  • Corrective actions for high-risk activities identified and implemented
  • Periodic review and validation of risk assessments
  • Training provided on hazard identification and risk assessment process

Gap Analysis

  • Clear definition of audit objectives and scope
  • Identification of applicable legal, regulatory, or standard requirements
  • Review of existing policies, procedures, and systems
  • Comparison of current practices against required benchmarks
  • Assessment of documentation completeness and accuracy
  • Evaluation of employee roles and responsibilities alignment
  • Verification of training and competency levels
  • Analysis of resource availability > manpower, tools, budget
  • Identification of performance shortfalls or inefficiencies
  • Review of incident/accident history for underlying gaps
  • Stakeholder interviews and feedback collection
  • Prioritization of identified gaps based on risk and impact
  • Action plan formulation with timelines and responsibilities
  • Review of previous gap analysis and improvement progress
  • Documentation and communication of audit findings

Electrical Audit

  • Compliance with electrical safety regulations and standards
  • Condition and maintenance of electrical panels and distribution boards
  • Proper labelling of circuits, panels, and switches
  • Use of appropriate Personal Protective Equipment (PPE)
  • Grounding and earthing system effectiveness
  • Load balancing and circuit overloading checks
  • Inspection of wiring systems for damage or deterioration
  • Adequacy of protection devices (MCBs, RCCBs, fuses, etc.)
  • Presence and condition of emergency shut-off switches
  • Lockout/Tagout (LOTO) procedure implementation
  • Inspection and testing of portable electrical equipment
  • Maintenance of electrical equipment logs and test records
  • Clearance and access around electrical installations
  • Presence of warning signs and hazard communication
  • Training and competency of personnel handling electrical systems
  • Is there a team trained to handle medical emergency ?

Ergonomic Assessment & Audit

  • opening meeting
  • Initial survey of the designated area
  • Workstation height and layout
  • Worker posture during tasks
  • Manual material handling practices
  • Repetitive motion frequency
  • Issues related to RSI, MSD, vision distortion
  • Tool and equipment ergonomics
  • Standing and sitting conditions
  • Lighting adequacy and placement
  • Noise and environmental comfort
  • Task duration and rest breaks
  • Access and movement clearance
  • Adjustable equipment and tools
  • Display screen and control panel positioning
  • Employee ergonomic training
  • Reporting system for discomfort
  • Review of ergonomic-related incidents

Access Audit

  • Accessible entrance with ramps or level access
  • Door width and ease of operation for wheelchair users
  • Clear signage with tactile or Braille options
  • Unobstructed and wide internal pathways
  • Accessible restrooms with grab bars and space for manoeuvring
  • Handrails on stairs and ramps
  • Adequate lighting in all areas
  • Accessible parking spaces near entrances
  • Elevators with low-mounted controls and audio signals
  • Flooring that is non-slip and easy to navigate
  • Seating areas with space for wheelchairs
  • Counter heights suitable for all users
  • Visual and audible emergency alarms
  • Accessibility of website and digital platforms
  • Inter dependability requirement within the work area
  • Obstructions caused by flower pots and interior objects
  • Staff awareness and training on accessibility needs