  • Fire Hazard Identification
  • Review of current fire and life safety infrastructure of the property as per drawing
  • Review of Onsite Emergency Plant (OSEP)
  • Checking the fire damper for its working condition
  • Checking of all access doors for integration with fire alarm
  • Checking of water pressure at the terrace of fire hydrant line
  • Checking the working of exhaust and integration with fire alarm
  • Checking of staircase for its pressurization, if done
  • Checking of fire man switch in the lift
  • Checking of fire extinguisher for its refilling and servicing status
  • Review the functional testing of fire and life safety system
  • Onsite installation review of protection system in the peripheral areas
  • Examine the availability of suitable emergency plan
  • Review of gaseous suppression system
  • Physical verification of fire pump rooms
  • Physical verification of all pumps with working status and parameters
  • Ascertaining the calibration and functional level of all pressure gauges
  • Review of inspection, testing and maintenance programs
  • Physical verification of pumps and panels related to fire safety and energy on test response and output
  • Physical verification of sprinkler system and working condition
  • Review of passive fire protection system
  • Review of PPE issuance record
  • Core compliance review of NBC 2016
  • Review of electrical maintenance activities
  • Review of all electrical testing reports for transformers, cables, protective devices, earth pits, power quality
  • Checking for earthing system
  • Check for lighting and power circuits Checking the condition of lightning arrestor
  • Power distribution network: unsafe condition and physical observation
  • Preparedness for emergency
  • System checking: available Drawing / SOP / OCP / Training
  • Review of documents related to Evacuation Drill
  • Complete physical check and review of BMS system and adherence\
  • Physical verification of diesel yard storage system and its working status
  • Physical verification of CV TV working condition and maintaining status of proceeding footages